Menu | Building Contruction | Internal Water Supply System | External Water Supply System | Drafting Fundamental | Plumbing Maintenance | Computer Aided Drafting | Site Surveying | Blueprint Reading | Contract Procedure | Builders Quantities And Estimating | Introduction To Plumbing Design | Water Pumping System | Water Treatment | Sewerage System | Fire Fighting Plumbing System

                                               Klik pada tajuk untuk pautan

Menu
Objektif
Kakitangan
Pembelajaran
Pengajian Teknikal
Pengajian Akademik
Kokurikulum
Galari Foto

 

 

TCP 3041 PLUMBING MAINTENANCE

Understanding the various type of problems,  identification and location of blockages in water supply and sanitary system. Writing a report on the maintenance works. Repair and make good to all blockages and faulty valves and joints.  The materials and tools used in maintenance works, method and procedures of repairing faulty valves and joints and clearance of blockages..

 Semester 3
Scheme Of Work 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Lesson Plan Theory 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Lesson Plan Practical 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

 

   

 

 

   WC Blockage Using Auger To Clear

 

    Clear  WC     

     blockage

  

 

Close Couple WC

 

 

Drain Cleaning Machine

 

 

 

 

 

 

 

 

 

 

 

 

Job Sheet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Information Sheet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Exercise Sheet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Nota Teori 1                                  
Subjek Teori 1                                  
 Presentation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Subjek Teori

                                   
INSPECTION FOR WATER RETICULATION AND WATER TANK 1                    
INSPECTION AND MAINTENANCE OF SANITARY APPLIANCES 1                    
INSPECTION AND MAINTANENCE FOR INTERNAL PIPE SYSTEM 1                    

CHECK AND MAINTANENCE (HOSE REEL)

1                    
INSPECTION AND MAINTANENCE SEWERAGE SYSTEM 1                    
PROJECT REPORT 1                                  
Subjek Amali                                    
  1 2 3 4 5                          
  1 2 3 4 5                          
                                     
  1 2 3 4 5                          
  1 2 3 4 5                          
Theory Test 1 ( 10%) 1                              
Theory Test 1 ( 10%) 1                              
PracticalTest 1 ( 20%) 1                              
Practical Assignment  (20%) 1                              
Final Practical ( 40% ) 1                              

Repair Ball Valve Repair Cold Water Storage Tank Maintenances Water Closet Clear Blockage

Menu | Building Contruction | Internal Water Supply System | External Water Supply System | Drafting Fundamental | Plumbing Maintenance | Computer Aided Drafting | Site Surveying | Blueprint Reading | Contract Procedure | Builders Quantities And Estimating | Introduction To Plumbing Design | Water Pumping System | Water Treatment | Sewerage System | Fire Fighting Plumbing System