Menu | Building Contruction | Internal Water Supply System | External Water Supply System | Drafting Fundamental | Plumbing Maintenance | Computer Aided Drafting | Site Surveying | Blueprint Reading | Contract Procedure | Builders Quantities And Estimating | Introduction To Plumbing Design | Water Pumping System | Water Treatment | Sewerage System | Fire Fighting Plumbing System

                                             Klik pada tajuk untuk pautan

 

Menu
Objektif
Kakitangan
Pembelajaran
Pengajian Teknikal
Pengajian Akademik
Kokurikulum
Galari Foto

 

 

 

 

 

 

 TCV 2072  SITE SURVEYING

The scope of the subject will be focused on the basic theory and practical of surveying and leveling. Study of instrument for measuring lines and determining distances, instruments for measuring angles, elevations and determining directions. The care and use of Engineer’s level and transit, actual fieldwork, running and measuring a closed traverse. The plotting of grid elevations by longitudinal and cross-section leveling, preparing a contour plan of the site. Positioning of a building on the site. Measuring an existing building height by theodolite.

 

 

 

 

 Semester  2
Scheme Of Work

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

 

  

 

Trimble DiNi Digital Level - Accurate Height Measurements for Land Surveying

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lesson Plan Theory

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Lesson Plan Practical

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Job Sheet

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Information Sheet

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Exercise Sheet

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Nota Teori

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Subjek Teori                                        
 Presentation

1

2

3

4

5

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

 Test 

1

2

3

                                 

  Subjek Teori

1

2

3

                                 

  Pengenalan CCV  2042 

1

2

3

                                 

  Pengenalan ukuran jarak

1

2

3

                                 

  Ukur kejuruteraan

1

2

3

                                 

  Ukur aras

1

2

3

                                 

  Ujian 1 (15%) 1 jam

1

2

3

                                 

  Contour survey

1

2

3

                                 

  Pengenalan ukur teodolite

1

2

3

                                 

  Ukur teodolite

1

2

3

                                 

  Pengenalan memancang tanda

1

2

3

                                 

  Memancang tanda utk talian paip

1

2

3

                                 

 Ukur Kompas

1 2 3                                  

  Ujian 2 (10%) 1 jam

1 2 3                                  

  Amali

                                       

  Pengenalan alat ukur dan kaedah menggunakan / mengendalikan

1                

  Mendirisiapkan kaki tiga dan pengarasan alat aras

1                

  Latihan ujian dua piket

1                

  Latihan mengukur / mendapatkan jarak menggunakan alat aras

1                

  Memilih dan menanda stesen untuk kerja ukur

1                

  Latihan merekod bacaan /mencerap bacaan kaedah naik/turun

1                

  Latihan mencerap bacaan kaedah ukur aras memanjang

1                

  Latihan merancang tanda talian paip menggunakan alat aras

1                

 Ujian Akhir ( 40% )

1                

Menu | Building Contruction | Internal Water Supply System | External Water Supply System | Drafting Fundamental | Plumbing Maintenance | Computer Aided Drafting | Site Surveying | Blueprint Reading | Contract Procedure | Builders Quantities And Estimating | Introduction To Plumbing Design | Water Pumping System | Water Treatment | Sewerage System | Fire Fighting Plumbing System1